Work Log 

Work log allows you to record the time spent on a change or tasks within a change. It also allows you to calculate and record the billable hours based on the resolution time and exchange rate.

This enables admins to track the number of technicians working on a change or a change task and each of their progress.

Role Required: SDAdmin and technicians with work log permissions. 

Add Work Log   

To add a work log,

In the Add Worklog form, fill out the following details:

Fields

Description

Comments

Owner

Select the technician from the drop-down.

-

Worklog Type

Select the technician's work mode, such as service, overtime support, remote, etc.

-

Include non-operational hours

Enable the checkbox to include non-operational hours in the resolution time.

This can also be enabled in the work log timer.

Executed Time

Specify the duration taken to resolve the task.

-

Time Taken to Resolve

Auto-populated in the hour format, depending on the executed time.

-

Currency

Choose the required currency from the drop-down.

Base currency and its exchange rate is set by default.

Exchange Rate

Auto-populated based on the chosen currency.

 

Technician's Cost per Hour

(non-editable field)

Add the Cost per hour in the technician details page as per base currency.

This field auto-converts the cost as per the chosen currency.

Hover over the  icon to view the equivalent cost in base currency.

Icon will not be available when base currency is chosen.

 

 

 

Tech Charges

Auto-calculated based on cost per hour and exchange rate.

Other Charges

Enter additional charges incurred (For example, new hardware), if any.

Total Charges

Auto-calculated based on tech charges and other charges.

Description

Provide additional details.

The timer comments will be added here by default, which can be edited further.

 

 

Technician Charge Calculation 

Technician's cost per hour and other charges are calculated based on the chosen currency and exchange rate.

Tech Charges = Time Taken to Resolve * Technician's Cost per Hour

Total Charge = Tech Charges + Other Charges

 

View Work Log

Go to the required change details page and click the Worklog tab on the left pane. You will find a list of work log records created for the change, along with the total billable charges.

To add/view work log records for a change task,

Edit Work Log  

 

In the Edit Worklog form, selecting any currency will auto-populate its exchange rate configured when the work log was created. You can edit it manually as per the current exchange rate if needed.  
Changes made to the currency and exchange rate are applicable only to the chosen work log.

 Delete Work Log